Rustic Collection Shiplap

  • Rough sawn, textured surface
  • Easy to install on walls and ceilings
  • Barn wood manufactured from new lumber
Color/Finish: Dark Brown
  • White
  • Natural
  • Light Brown
  • Gray
  • Dark Brown
  • Charcoal

Rustic Collection shiplap is perfect for your next reclaimed wood project. It's new lumber that has been distressed, primed and painted to have the authentic look and texture of vintage barn wood.

The Rustic Collection is available in both shiplap and trim boards in natural and prefinished colors to craft beautifully textured walls, ceilings and DIY projects. Available in lengths up to 8 feet.

 

Nominal Dimensions

 

Actual Dimensions

 

Exposed Face

 

Sq. Ft. Per Piece

 

Sq. Ft. Per Pack

 

Boards Per Pack

1 in. x 6 in. x 4 ft. Shiplap

 

5/8 x 5-3/8 x 4

4-5/8

1.54

9.24

6

 
1 in. x 6 in. x 6 ft. Shiplap

 


5/8 x 5-3/8 x 6

 
4-5/8

 
2.31

 
13.86

 
6

 
1 in. x 6 in. x 8 ft. Shiplap

 

 
5/8 x 5-3/8 x 8

 
4-5/8

 
3.08

 
18.48

 
6

 
1 in. x 8 in. x 4 ft. Shiplap

 

 
5/8 x 7-1/16 x 4

 
6-7/16

 
2.15

 
12.9

 
6

 
1 in. x 8 in. x 6 ft. Shiplap

 

 
5/8 x 7-1/16 x 6

 
6-7/16

 
3.22

 
19.32

 
6

 
1 in. x 8 in. x 8 ft. Shiplap

 

 
5/8 x 7-1/16 x 8

 
6-7/16

 
4.3

 
25.8

 
6

 
1 in. x 4 in. x 8 ft. Trim

 

 
3/4 x 3-1/2 x 8

 
3-1/2

 
2.33

 
9

 
4

*Job pack quantities by special order

EDGE_Rustic Collection_Sell Sheet

Sell Sheet

1316 KB

Download (Language):

Edge_Catalog_Inline

Catalog

17032 KB

Download (Language):

EDGE_Rustic Collection_Install Instructions

Installation Instructions

178 KB

Download (Language):

  • Can I use Rustic Collection shiplap on my bathroom walls?
    Yes, these boards can be used on walls within a bathroom. We recommend you seal the boards with a wood protector sealant to protect them from moisture.
  • Do these have rabbet joints (or any joints) cut into them?
    When installed horizontally Rustic Collection shiplap features a rabbet joint on both top and bottom edges of the board allowing piece to snugly fit together. The board ends do not have a pattern and butt directly together without overlap.
  • What color stain can I use to match?
    Rustic Collection products go through a proprietary color formulation process, therefore an exact paint match is difficult. Consult with a paint professional at your local retailer to specify a custom color that suites your needs.
  • What is the actual width that will be visible?
    The width of the 1x6 shiplap board is 5.375 in. with a thickness of .625 in. and an exposed face of 4.625 in. The width of the 1x8 shiplap board is 7.0625 in. with a thickness of .625 in. and an exposed face of 6.44 in. The width of the trim board is 3.5 in. with a thickness of .75 in.
  • Is the board smooth on the opposite side?
    Both sides of the board feature a rough sawn texture that helps mimic the natural texture and patina of aged barn wood.
Rustic Collection Gray shiplap bedroom accent wall

Coverage calculator

Find your coverage

UFP-Edge Rustic Charcoal shiplap accent wall in child's bedroom

Surf Shack Boy's Bedroom

We collaborated with the principal designer and owner of Sno Valley Studio to create a monochromatic, timeless look for her son's bedroom using Rustic Charcoal shiplap.

View Project

image alt text here

Join our Community!

Thanks for signing up!
There was an error with your request, please try again later.