Skip Navigation
Go back
Open Menu
Pattern and Shiplap

Timeless Collection

Transform your space with the elegance of Timeless—a refined shiplap that effortlessly elevates interior walls and ceilings with its sleek appearance. These ultra-smooth wood boards offer the perfect balance of design, texture, and depth.

Its seamless interlocking system ensures simple installation and a consistent finish that highlights the beauty of clean, uninterrupted lines—reducing the amount of exposed fasteners. Timeless is particularly well-suited to modern farmhouse and coastal aesthetics, yet its understated elegance makes it a perfect choice for any design vision. Timeless is available as a 1/8-inch nickel gap shiplap, featuring a distinctive hybrid profile that blends the best of traditional shiplap and tongue-and-groove designs, as well as edge & center bead, and V-groove (WP4) profiles in all colors.

Colors & Finishes:

Farmhouse White
Granite Gray
Midnight Black
Primed
Linen
Eventide
Truffle
Sea Glass

Select a finish above to view sample ordering options.

Specifications

Ultra-smooth Surface icon

Ultra-smooth Surface

Factory applied gesso coating achieves a polished-to-perfection finish.

Prefinished Shiplap icon

Prefinished Shiplap

Ready-to-install, primed or prefinished shiplap to suit your design preferences.

Various Width Options icon

Various Width Options

Nickel gap shiplap available in 6-inch or 8-inch widths for your specific vision.

Unmatched Stability icon

Unmatched Stability

Relief grooves reduce cupping, ensuring boards keep a straight appearance.

Compatible Trim Products icon

Compatible Trim Products

Complementary, 1-inch thick trim to create a cohesive look around shiplap edges.

Made for Elevated Interiors icon

Made for Elevated Interiors

Versatile enough for horizontal and vertical interior applications.

Effortless Style, Bold Impact

Effortless Style, Bold Impact

Classic doesn’t have to be predictable—make it your own and let your ceiling or walls do the talking. This nickel gap shiplap transforms any space into a standout feature.

A Serene Space to Make Memories

A Serene Space to Make Memories

Edge’s exquisite nickel gap shiplap adds a tranquil touch to any construction. See the product shine in this Knoxville-based dream home project.

Unveil the Beauty of Nickel Gap Shiplap

Unveil the Beauty of Nickel Gap Shiplap

Whether you're envisioning a serene retreat or a striking statement, the flawless design of Edge nickel gap shiplap delivers irresistible charm. Order a sample or find a dealer to get started.

Order a Pattern and Shiplap Sample:

Order a 12” cut sample of Pattern and Shiplap Shiplap

Frequently Asked Questions

What is nickel gap shiplap?

How do I install nickel gap shiplap?

Can I use Timeless nickel gap shiplap on my bathroom walls?

What are the available profiles for Timeless boards?

What's the benefit of the interlocking profile?

Is Timeless an engineered product?

How is Timeless different from other nickel gap shiplap products on the market?

Is the board smooth on the opposite side?